• About
    • Ethics policy
    • Privacy Policy
    • Ownership, funding and corrections
    • Complaints procedure
    • Terms & Conditions
  • Contact
  • Support
  • Newsletter
Brighton and Hove News
23 May, 2026
  • News
    • Politics
    • Business
    • Opinion
    • Community
  • Arts and Culture
    • Music
    • Theatre
    • Food and Drink
  • Sport
    • Brighton and Hove Albion
    • Cricket
  • Newsletter
  • Public notices
  • Advertise
No Result
View All Result
  • News
    • Politics
    • Business
    • Opinion
    • Community
  • Arts and Culture
    • Music
    • Theatre
    • Food and Drink
  • Sport
    • Brighton and Hove Albion
    • Cricket
  • Newsletter
  • Public notices
  • Advertise
No Result
View All Result
Brighton and Hove News
No Result
View All Result
Home Brighton

Landslip causes rail chaos for Brighton and Hove commuters

by Frank le Duc
Monday 1 Aug, 2011 at 6:39PM
A A
0

Thousands of rail commuters from Brighton, Hove and Portslade face long delays on their way home this afternoon after a landslip blocked the main line.

The landslip, in the South Croydon area, was caused by a burst water main in Stanhope Road which was reported at about 9.30am today.

The track is covered in water and debris and no trains are running south from East  Croydon.

All lines between East Croydon and neighbouring South Croydon Station are blocked.

Trains between Brighton and Gatwick are running once every half hour.

Anyone heading to the airport is advised to allow three to four hours for their journey.

Replacement buses are running but Southern, the train operator, said: “East Croydon station is extremely busy at the moment with very long queues waiting for replacement buses.”

Southern urged passengers not to try to travel home via Victoria but to use Waterloo and Charing Cross instead.

A trackside fire between Tonbridge and Hastings added to the disruption.

The company said that London Buses, Metrobus, London Underground, South West Trains, Southeastern, London Midland, First Great Western, Croydon Tramlink and First Capital Connect were accepting Southern tickets on any reasonable route.

First Capital Connect, which runs Thameslink services, said that the first train from London Bridge to Brighton would not be until after 7pm this evening.

The track will be closed again later this evening for emergency engineering works.

Support quality, independent, local journalism that matters. Donate here.
ShareTweetShareSendSendShare

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

This site uses Akismet to reduce spam. Learn how your comment data is processed.

Most read

New bus route to start next month

Pub tile developer asks court to make council pay his costs

Palm house turned into butterfly garden

New mayor takes over in Brighton and Hove

Landslip causes rail chaos for Brighton and Hove commuters

Councillors vote to close oldest school in Brighton

School plans 10ft fence around playing field

Father pays tribute to daughters who drowned off Brighton beach

Phone-free restaurant gets permanent home

Odeon developer asks permission for 12-month ad shroud

Newsletter

Arts and Culture

  • All
  • Music
  • Theatre
  • Food and Drink
Oh To Believe in Another World: Shostakovich Symphony No.10

Oh To Believe In Another World

23 May 2026
Robocop vs The Terminator vs Gabriel Featherstone

Robocop vs The Terminator vs Gabriel Featherstone vs direction

23 May 2026
We Are Warriors, Cab Road Tunnel, Brighton Festival

We Are Warriors, Cab Road Tunnel, Brighton Festival

23 May 2026
Whisky Tango Foxtrot, Lantern Theatre, Brighton Fringe, May 22&23rd 2026

Review: Whisky Tango Foxtrot!

23 May 2026
Load More

Sport

  • All
  • Brighton and Hove Albion
  • Cricket
Bruce on the Boundary – Robinson ready to take the next step

Rain gods smile as Sussex draw with Somerset at Taunton

by Richard Latham - ECB Reporters Network supported by Rothesay
18 May 2026
0

Somerset 526-8 dec (128.4 overs) Sussex 253 (71.1 overs) and 113-7 (57.4 overs) Somerset (15 points) drew with Sussex (10...

Bruce on the Boundary – Robinson ready to take the next step

Sussex hang on as Somerset match heads for a draw

by Richard Latham - ECB Reporters Network supported by Rothesay
17 May 2026
0

Somerset 526-8 dec (128.4 overs) Sussex 236-8 (69.1 overs) Sussex (1 point) trail Somerset (6 points) by 290 runs with...

Brighton and Hove Albion thwarted by last-gasp goal at Leeds

Brighton and Hove Albion thwarted by last-gasp goal at Leeds

by Mark Tiro
17 May 2026
0

Leeds United 1 Brighton and Hove Albion 0 Dominic Calvert-Lewin struck a stoppage-time winner as Leeds dealt Brighton’s hopes of...

One change as Brighton and Hove Albion face Leeds United

One change as Brighton and Hove Albion face Leeds United

by Frank le Duc
17 May 2026
0

As Brighton and Hove Albion face Leeds United, Seagulls head coach Fabian Hürzeler has made one change to the side...

Load More
August 2011
M T W T F S S
1234567
891011121314
15161718192021
22232425262728
293031  
« Jul   Sep »

RSS From Sussex News

  • Detective arrested on suspicion of drink driving 21 May 2026
  • First train with Great British Railways livery unveiled in Sussex 20 May 2026
  • Man jailed for burglary, theft and fraud 20 May 2026
  • Three months of work to start at railway station 20 May 2026
  • Sussex Police detective inspector denies child sex offences and perverting justice 19 May 2026
ADVERTISEMENT
  • About
  • Contact
  • Support
  • Newsletter
  • Privacy
  • Complaints
  • Ownership, funding and corrections
  • Ethics
  • T&C

© 2023 Brighton and Hove News

No Result
View All Result
  • News
    • Opinion
  • Arts and Culture
    • Music
    • Theatre
  • Sport
    • Cricket
  • Newsletter
  • Public notices
  • Advertise
  • About
  • Contact

© 2023 Brighton and Hove News