• About
    • Ethics policy
    • Privacy Policy
    • Ownership, funding and corrections
    • Complaints procedure
    • Terms & Conditions
  • Contact
  • Support
  • Newsletter
Brighton and Hove News
23 May, 2026
  • News
    • Politics
    • Business
    • Opinion
    • Community
  • Arts and Culture
    • Music
    • Theatre
    • Food and Drink
  • Sport
    • Brighton and Hove Albion
    • Cricket
  • Newsletter
  • Public notices
  • Advertise
No Result
View All Result
  • News
    • Politics
    • Business
    • Opinion
    • Community
  • Arts and Culture
    • Music
    • Theatre
    • Food and Drink
  • Sport
    • Brighton and Hove Albion
    • Cricket
  • Newsletter
  • Public notices
  • Advertise
No Result
View All Result
Brighton and Hove News
No Result
View All Result
Home Brighton

Calls for N7 to be permanently re-routed after St James's Street reopens

by Sue Pearson
Thursday 27 May, 2010 at 11:36AM
A A
0

Kemp Town residents are calling for the N7 night bus to be permanently re-routed along Marine Parade when the St James’s Street reopens next month.

The gas works along St James’s Street have slightly over run, and the busy street is now due to reopen on Monday, June 7.

While the works have been taking place, the night buses were first diverted along Madeira Place, to the dismay of residents who were disturbed by it “thundering past” in the early hours.

Following complaints, it was re-routed along the seafront – a change which residents now want to be made permanent.

At a meeeting of the St James’s Street local action team (LAT) on May 12, Kingscliffe Society committee member Trevor Scoble suggested asking Brighton and Hove Buses to permanently re-route the N7 bus, a proposal agreed by the group.

It was felt this would alleviate some of the noise due to people congregating at the bottom of the street in order to catch the bus home.

And subject to passenger feedback, the residents could get their way. Roger French, managing director of Brighton and Hove Buses, told the News: “We are going to do some surveys to determine passenger preferences for the best route to suit their needs.”

During the last week of works, the road will be completely closed to buses because of reconnection work at the junctions with Madeira Place and Dorset Gardens.

It’s also possible there may need to be a mall amount of work at the foot of St James’s Street.

Support quality, independent, local journalism that matters. Donate here.
ShareTweetShareSendSendShare

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

This site uses Akismet to reduce spam. Learn how your comment data is processed.

Most read

New bus route to start next month

Pub tile developer asks court to make council pay his costs

Palm house turned into butterfly garden

New mayor takes over in Brighton and Hove

Calls for N7 to be permanently re-routed after St James's Street reopens

Councillors vote to close oldest school in Brighton

School plans 10ft fence around playing field

Phone-free restaurant gets permanent home

Father pays tribute to daughters who drowned off Brighton beach

Odeon developer asks permission for 12-month ad shroud

Newsletter

Arts and Culture

  • All
  • Music
  • Theatre
  • Food and Drink
Oh To Believe in Another World: Shostakovich Symphony No.10

Oh To Believe In Another World

23 May 2026
Robocop vs The Terminator vs Gabriel Featherstone

Robocop vs The Terminator vs Gabriel Featherstone vs direction

23 May 2026
We Are Warriors, Cab Road Tunnel, Brighton Festival

We Are Warriors, Cab Road Tunnel, Brighton Festival

23 May 2026
Whisky Tango Foxtrot, Lantern Theatre, Brighton Fringe, May 22&23rd 2026

Review: Whisky Tango Foxtrot!

23 May 2026
Load More

Sport

  • All
  • Brighton and Hove Albion
  • Cricket
Bruce on the Boundary – Robinson ready to take the next step

Rain gods smile as Sussex draw with Somerset at Taunton

by Richard Latham - ECB Reporters Network supported by Rothesay
18 May 2026
0

Somerset 526-8 dec (128.4 overs) Sussex 253 (71.1 overs) and 113-7 (57.4 overs) Somerset (15 points) drew with Sussex (10...

Bruce on the Boundary – Robinson ready to take the next step

Sussex hang on as Somerset match heads for a draw

by Richard Latham - ECB Reporters Network supported by Rothesay
17 May 2026
0

Somerset 526-8 dec (128.4 overs) Sussex 236-8 (69.1 overs) Sussex (1 point) trail Somerset (6 points) by 290 runs with...

Brighton and Hove Albion thwarted by last-gasp goal at Leeds

Brighton and Hove Albion thwarted by last-gasp goal at Leeds

by Mark Tiro
17 May 2026
0

Leeds United 1 Brighton and Hove Albion 0 Dominic Calvert-Lewin struck a stoppage-time winner as Leeds dealt Brighton’s hopes of...

One change as Brighton and Hove Albion face Leeds United

One change as Brighton and Hove Albion face Leeds United

by Frank le Duc
17 May 2026
0

As Brighton and Hove Albion face Leeds United, Seagulls head coach Fabian Hürzeler has made one change to the side...

Load More
May 2010
M T W T F S S
 12
3456789
10111213141516
17181920212223
24252627282930
31  
« Apr   Jun »

RSS From Sussex News

  • Detective arrested on suspicion of drink driving 21 May 2026
  • First train with Great British Railways livery unveiled in Sussex 20 May 2026
  • Man jailed for burglary, theft and fraud 20 May 2026
  • Three months of work to start at railway station 20 May 2026
  • Sussex Police detective inspector denies child sex offences and perverting justice 19 May 2026
ADVERTISEMENT
  • About
  • Contact
  • Support
  • Newsletter
  • Privacy
  • Complaints
  • Ownership, funding and corrections
  • Ethics
  • T&C

© 2023 Brighton and Hove News

No Result
View All Result
  • News
    • Opinion
  • Arts and Culture
    • Music
    • Theatre
  • Sport
    • Cricket
  • Newsletter
  • Public notices
  • Advertise
  • About
  • Contact

© 2023 Brighton and Hove News