• About
    • Ethics policy
    • Privacy Policy
    • Ownership, funding and corrections
    • Complaints procedure
    • Terms & Conditions
  • Contact
  • Support
  • Newsletter
Brighton and Hove News
25 August, 2026
  • News
    • Politics
    • Business
    • Opinion
    • Community
  • Arts and Culture
    • Music
    • Theatre
    • Food and Drink
  • Sport
    • Brighton and Hove Albion
    • Cricket
  • Newsletter
  • Public notices
  • Advertise
No Result
View All Result
  • News
    • Politics
    • Business
    • Opinion
    • Community
  • Arts and Culture
    • Music
    • Theatre
    • Food and Drink
  • Sport
    • Brighton and Hove Albion
    • Cricket
  • Newsletter
  • Public notices
  • Advertise
No Result
View All Result
Brighton and Hove News
No Result
View All Result
Home Brighton

Seafront cycle lane roadworks to start today

by Frank le Duc
Tuesday 4 Aug, 2020 at 2:38AM
A A
5
First pictures of how new seafront cycle lane could look released

An artist's impression of the recently removed seafront cycle lane

Work will start today on the seafront cycle land on the A259 between the Palace Pier and Fourth Avenue, in Hove.

An artist’s impression of the proposed seafront cycle lane

“All cars must be removed from the south side of the A259 between the Palace Pier and Fourth Avenue before 12pm on Tuesday 4 August,” Brighton and Hove City Council said.

The council added: “Any cars remaining here will be towed or relocated so that work can begin on time.

“The cycle lane will be used by cyclists travelling westbound and will eventually extend to the western boundary of the city when the second phase of work is completed later in the year.

“Eastbound cyclists will continue to use the existing footway cycle facility – and lines and signage will be altered accordingly.

“Work is expected to take around two weeks to complete, with the first week of construction due to take place at night.

“Every effort will be made to keep this work and the associated noise to an absolute minimum.

“The temporary cycle lane was part of the Urgent Transport Action Plan produced in response to the covid-19 pandemic and agreed by the Environment, Transport and Sustainability Committee on (Tuesday) 23 June.

“It will be funded from money awarded to the council by the Department for Transport’s Covid-19 Emergency Active Travel Fund.”

The council said that the cycle lane would be up to three metres wide on the seafront side of the road.

Plastic bollards and barriers like those used for the Old Shoreham Road cycle lane, in Hove, will be used to segregate traffic.

The council also said: “As a result of the work, around 60 per cent of parking spaces between the Palace Pier and Fourth Avenue will be lost.

“Those that remain will be offset from the kerb to maintain an uninterrupted cycle lane.

“Parking on the north side of the carriageway will be unaffected.

“All disabled parking bays will be retained although some will be offset from the kerb with additional space provided on either side of the bays with new facilities to ensure additional safety and access.

“All signal-controlled pedestrian crossings will be retained and cyclists will be required to stop in the same way as motor vehicles.”

Support quality, independent, local journalism that matters. Donate here.
ShareTweetShareSendSendShare

Comments 5

  1. Patricia Rawlings says:
    6 years ago

    For a few cycles using the new lane on the 259 , 60% parking spaces will be lost, where are they supposed to go? Utter ridiculous, no sense at all. Bad enough parking anywhere let alone loosing another 60%.

    Reply
  2. Gavin Brewis says:
    6 years ago

    Why do we need more cycle lanes? Money could be spent on fixing the roads, more bins along the seafront, fix Madeira Drive and the Hippodrome.

    Reply
  3. Chris says:
    6 years ago

    I’m keen to see how it goes. I saw a big mix in opinions on other media.
    This is probably the fastest and cheapest way the council can test the idea before making a massive commitment. People were complaining about the cycle lane still being used on the pavement but there are at least three decent reasons for that: cut the pavement cycle lane traffic roughly in half (I would say that the west-bound side is a bit busier in the afternoons and evenings following typical work hours, and is also roughly when the most pedestrians are around to use the pavement); people get more time to get used to the idea, and east-bound cyclists don’t have to skim too close to west-bound motorists depending on how these plastic bollards and barriers will look and if they’ll be placed along the whole length; and no costly traffic signals to install on the east-bound side for what is just a trial at this point (as cyclists on the new lane will now be sharing the same traffic signals as the motorists).

    I think that the city could definitely benefit from some more parking facilities, but there are so many more efficient options which could be built and wouldn’t keep entire stretches of road reserved for what is just empty cars for hours at a time and not people actually going anywhere like a cycle lane would facilitate (for both cyclists and pedestrians).
    More underground parking, where possible, could be a brilliant space saver.

    Some people hate the idea, some people love it, but I don’t see the sense in hating it until it’s tried. I bet it will bring more good than a lot of people expect.

    Reply
  4. ANTHONY BROWN says:
    6 years ago

    Go for it Brighton and Hove! We did it in Tynemouth in the north east. All cyclists including families cycling safely along the sea front. It is also a buffer between the promenade and the coastal road so it is much more relaxing for walkers on the sea front.
    A more relaxed atmosphere all round !

    Reply
  5. MD says:
    6 years ago

    Tynmouth’s seafront road is not exactly a main thoroughfare. Its not a “A” road as the A193 is a couple of blocks back from the seafront. Our seafront road is the A259 and is a main East to West link road. You aren’t comparing like with like.

    Reply

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

This site uses Akismet to reduce spam. Learn how your comment data is processed.

Most read

D-day for plan to turn pub into housing

Reform selects candidate for Queen’s Park by-election

Seafront cycle lane roadworks to start today

Jury convicts man of raping 14-year-old girl

Brighton fan, 72, dies after falling ill following win over Aston Villa

Two men wanted after girl reports being sexually assaulted

Serial abuser jailed after choking and battering partner

Burglary detectives release CCTV

Anti-Zionist activist cleared of inviting support for Hamas after October 7

Five more locations for camera traffic enforcement proposed

Newsletter

Arts and Culture

  • All
  • Music
  • Theatre
  • Food and Drink
“Here we go: 234”…….

“Here we go: 234”…….

25 August 2026
Trust me, this is one of those “I was there!” concerts!

Trust me, this is one of those “I was there!” concerts!

25 August 2026
Girlband! to headline new music discovery night

Girlband! to headline new music discovery night

24 August 2026
US synthwave outfit The Black Queen to open 10th anniversary tour in Brighton

US synthwave outfit The Black Queen to open 10th anniversary tour in Brighton

20 August 2026
Load More

Sport

  • All
  • Brighton and Hove Albion
  • Cricket
Brighton and Hove Albion rout Aston Villa in opening game

Brighton and Hove Albion rout Aston Villa in opening game

by Edward Elliot - PA
23 August 2026
0

Brighton and Hove Albion 4 Aston Villa 0 Jack Hinshelwood struck twice in two first-half minutes as a rampant Brighton...

Brighton and Hove Albion host Aston Villa in Premier League opener

Brighton and Hove Albion host Aston Villa in Premier League opener

by Frank le Duc
23 August 2026
0

Brighton and Hove Albion are preparing to host Aston Villa in their opening fixture of the Premier League season this...

Bruce on the Boundary – Robinson ready to take the next step

Sussex beaten by Warwickshire in three-day thriller

by Brian Halford - ECB Reporters Network supported by Rothesay
22 August 2026
0

Sussex 156 (47.4 overs) and 207 (61.5 overs) Warwickshire 161 (47.3) and 206-9 (53.1 overs) Warwickshire (19 points) beat Sussex...

Bruce on the Boundary – Robinson ready to take the next step

High drama as Sussex and Warwickshire end day two finely poised

by Brian Halford - ECB Reporters Network supported by Rothesay
21 August 2026
0

Sussex 156 (47.4 overs) and 84-3 (23 overs) Warwickshire 161 (47.3 overs) Sussex (3 points) lead Warwickshire (3 points) by...

Load More
August 2020
M T W T F S S
 12
3456789
10111213141516
17181920212223
24252627282930
31  
« Jul   Sep »

RSS From Sussex News

  • Cyclist’s home gutted by fire caused by ebike battery 24 August 2026
  • Fire damages property in village 24 August 2026
  • Drug line controller jailed for seven years 23 August 2026
  • Motorcyclist injured in crash with car 22 August 2026
  • Fourth member of family pulled from water in Shoreham dies 21 August 2026
ADVERTISEMENT
  • About
  • Contact
  • Support
  • Newsletter
  • Privacy
  • Complaints
  • Ownership, funding and corrections
  • Ethics
  • T&C

© 2023 Brighton and Hove News

No Result
View All Result
  • News
    • Opinion
  • Arts and Culture
    • Music
    • Theatre
  • Sport
    • Cricket
  • Newsletter
  • Public notices
  • Advertise
  • About
  • Contact

© 2023 Brighton and Hove News