• About
    • Ethics policy
    • Privacy Policy
    • Ownership, funding and corrections
    • Complaints procedure
    • Terms & Conditions
  • Contact
  • Support
  • Newsletter
Brighton and Hove News
10 August, 2026
  • News
    • Politics
    • Business
    • Opinion
    • Community
  • Arts and Culture
    • Music
    • Theatre
    • Food and Drink
  • Sport
    • Brighton and Hove Albion
    • Cricket
  • Newsletter
  • Public notices
  • Advertise
No Result
View All Result
  • News
    • Politics
    • Business
    • Opinion
    • Community
  • Arts and Culture
    • Music
    • Theatre
    • Food and Drink
  • Sport
    • Brighton and Hove Albion
    • Cricket
  • Newsletter
  • Public notices
  • Advertise
No Result
View All Result
Brighton and Hove News
No Result
View All Result
Home Brighton

Brighton mainline hit by 174 signal failures since start of 2014

by Jo Wadsworth
Tuesday 12 May, 2015 at 8:23AM
A A
0
Thameslink’s first Monday morning gets off to a bumpy start

The Brighton mainline was hit by 174 signal failures in the last 15 months, almost three every week.

Brighton Station
Brighton commuters wait for a platform announcement after a signal failure leads to delays

The figures will come as no surprise to Brighton commuters, who rated the Brighton to Bedford Thameslink service the UK’s most unpopular in January.

Since then, train operators Southern and Thameslink and Network Rail have put together an action plan to improve services.

But commuters are still facing signal related delays, with failures leading to significant delays again just yesterday to mark Brighton Station’s 175th birthday.

The figures were released as part of a freedom of information request via the What Do They Know website.

A Network Rail spokesperson said: “The classification of ‘signal failures’ includes a number of different issues with different sets of equipment, and the headline figure includes everything from momentary problems to those that cause significant delays.

“What is more important from a passenger perspective, is not the number of failures themselves, but the impact that they have.

“The Brighton mainline and the routes into Victoria and London Bridge are very busy and also include the most congested stretch of railway in the country (near Croydon).

“As a result, small problems can have major impacts and we are focussing our attentions on improving the reliability of our assets at crucial locations, such as busy junctions and stations.

“A huge amount of work and investment has taken place to improve the reliability of the route, not least the work associated with the £6.5bn Thameslink Programme.

“In addition to the rebuilding of the routes into London Bridge, since Christmas 2013 we have completely rebuilt several important junctions (including Gatwick and Keymer), introduced new signalling on different parts of the route, and put a brand-new control centre into operation at Three Bridges.”

A spokesman for Southern said: “Although railway infrastructure failure plays a large part in punctuality performance, it is not responsible alone for the figures.

“There are many other variables such as poor weather conditions, trespass on the railway and broken down trains which all play a part.

“We are working very closely with Network Rail to improve punctuality on the Brighton Main Line and on other parts of the Southern network.

“We’ve published our joint Performance Improvement Plan which is designed to deliver performance benefits across the whole of the Southern network. We are delivering against that and as it evolves, we update and publish every four weeks.

“The new Southern timetable, which comes into effect on 17 May, includes a number of minor service retimings and changes to calling patterns, to help improve performance across the Southern network, including those into and out of London Bridge.”

A Thameslink spokesperson said: “We are keenly aware that the reliability of signalling and track on the Brighton Mainline has been causing significant issues for our services and our passengers.

“The route is one of the most congested in the country and, with the added impact of the work to unclog one of its major bottlenecks at London Bridge, any problem can cause significant delays.

“We are working jointly with Network Rail and Southern on an improvement plan to address known issues.

“Part of this plan is for Network Rail to improve reliability of signalling and other equipment.  We are reporting against the targets we identified in this plan every four weeks, this can be found on our website www.thameslinkrailway.com/performance.”

 

Support quality, independent, local journalism that matters. Donate here.
ShareTweetShareSendSendShare

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

This site uses Akismet to reduce spam. Learn how your comment data is processed.

Most read

Brighton venue announces closure

Brighton mainline hit by 174 signal failures since start of 2014

Man’s body recovered from sea at Hove

Park in Hove to have upgraded games area

Holiday let must go, planning inspector rules

Brighton conquer Rome in Amex friendly

Man charged with slavery and drug offences

Bereaved son threatened with court over unbilled council tax

Clegg’s aide denies sex attack at party conference in Brighton

Buzzcocks announce Brighton concert

Newsletter

Arts and Culture

  • All
  • Music
  • Theatre
  • Food and Drink
Vienna Vienna announces a handful of UK dates

Vienna Vienna announces a handful of UK dates

9 August 2026
Man/Woman/Chainsaw perform whole debut album at Brighton record store

Man/Woman/Chainsaw perform whole debut album at Brighton record store

9 August 2026
Buzzcocks announce Brighton concert

Buzzcocks announce Brighton concert

8 August 2026
Opus Kink: Pretty Showboys on the Terrace

Opus Kink: Pretty Showboys on the Terrace

8 August 2026
Load More

Sport

  • All
  • Brighton and Hove Albion
  • Cricket
Park in Hove to have upgraded games area

Park in Hove to have upgraded games area

by Frank le Duc
10 August 2026
0

Work has started to give a park in Hove an upgraded play area thanks to an unusual recycling project. The...

Sussex come up short as Hampshire shine at Hove

by Frank le Duc
9 August 2026
0

Hampshire 383-9 (50 overs) Sussex 332 (48.5 overs) Hampshire (4 points) beat Sussex (0 points) by 51 runs Hampshire’s Toby...

Brighton conquer Rome in Amex friendly

Brighton conquer Rome in Amex friendly

by Frank le Duc
8 August 2026
0

Brighton and Hove Albion 3 Roma 0 Rome wasn’t built in a day, they say, and the 2026-27 Albion team...

Bruce on the Boundary – Robinson ready to take the next step

Sussex beaten by Worcestershire in One Day Cup at Hove

by Frank le Duc
7 August 2026
0

Sussex Sharks 333-9 (50 overs) Worcestershire Rapids 334-6 (48.2 overs) Worcestershire (4 points) beat Sussex (0 points) by four wickets...

Load More
May 2015
M T W T F S S
 123
45678910
11121314151617
18192021222324
25262728293031
« Apr   Jun »

RSS From Sussex News

  • PCSO faces court charged with dangerous driving 7 August 2026
  • Driver dies 11 days after crash 6 August 2026
  • Two drug dealers join vape shop boss in jail 6 August 2026
  • Boy, 16, found guilty of murder 5 August 2026
  • Brighton’s ‘Mutations Festival’ announces the first 71 acts to join headliners Fat Dog and Mike D 5D (Beastie Boys) 5 August 2026
ADVERTISEMENT
  • About
  • Contact
  • Support
  • Newsletter
  • Privacy
  • Complaints
  • Ownership, funding and corrections
  • Ethics
  • T&C

© 2023 Brighton and Hove News

No Result
View All Result
  • News
    • Opinion
  • Arts and Culture
    • Music
    • Theatre
  • Sport
    • Cricket
  • Newsletter
  • Public notices
  • Advertise
  • About
  • Contact

© 2023 Brighton and Hove News