• About
    • Ethics policy
    • Privacy Policy
    • Ownership, funding and corrections
    • Complaints procedure
    • Terms & Conditions
  • Contact
  • Support
  • Newsletter
Brighton and Hove News
17 May, 2026
  • News
    • Politics
    • Business
    • Opinion
    • Community
  • Arts and Culture
    • Music
    • Theatre
    • Food and Drink
  • Sport
    • Brighton and Hove Albion
    • Cricket
  • Newsletter
  • Public notices
  • Advertise
No Result
View All Result
  • News
    • Politics
    • Business
    • Opinion
    • Community
  • Arts and Culture
    • Music
    • Theatre
    • Food and Drink
  • Sport
    • Brighton and Hove Albion
    • Cricket
  • Newsletter
  • Public notices
  • Advertise
No Result
View All Result
Brighton and Hove News
No Result
View All Result
Home Brighton

End to Shelter Hall roadworks finally in sight after four years

by Jo Wadsworth
Friday 26 Jun, 2020 at 1:37PM
A A
2
End to Shelter Hall roadworks finally in sight after four years

The temporary Shelter Hall cycle path - Picture by Mark Strong

Roadworks on the A259 which have dragged on for four and a half years are finally due to be completed in weeks.

The Shelter Hall beneath is now complete, and is due to open on July 4 as a fancy food hall featuring Carlito Burrito, Smorls, Fatto a Mano and more.

Since work began restoring the Victorian building, the cycle lane above it on Kings Road at the bottom of West Street has been closed, with cyclists asked to share a narrow footpath with pedestrians.

The number of lanes for motorised traffic has also been reduced from three lanes to two.

The final part of the project, creating dedicated crossing phases for cyclists and banning right turns from West Street at the junction with Kings Road and West Street, began last month and is now due to finish in August.

However, the cycle lane will soon be moved off the pavement and onto the road itself, following last week’s approval of this and a raft of other measures to give more space to pedestrians and cyclists.

A council spokesman said: “The scheme will be substantially complete early August and the junction works around mid-August.”

Work started on the Shelter Hall in October 2015, and the roadworks above began on January 4, 2016.

They were originally slated to last for two years at a cost of £10 million, but the costs rose to £19 million after the council decided to upgrade the quality of the replacement Shelter Hall to make it more attractive to investors.

The extra money was also needed because the structure underpinning the A259 above was in a worse state than expected, requiring complex engineering work.

The Shelter Hall was granted an alcohol licence last month, after councillors were told the food hall would improve the demographics of the seafront.

Shelter Hall Raw will feature ten pop up stalls from Brighton and Hove eateries. The first line up includes Fatto a Mano, Lost Boys Chicken, Carlito Burrito, Brighton Coffee Works, Toasted by GB Charcuterie and Smorls.

Support quality, independent, local journalism that matters. Donate here.
ShareTweetShareSendSendShare

Comments 2

  1. Billy says:
    6 years ago

    Hurrah that they are closing ‘covid alley’ at last, but it’s not clear why this has taken so long.
    The upper part of the shelter hall building is not yet finished and yet work seems to have ground to a halt, maybe because they have no tenant for that restaurant section yet.
    Behind the hoarding is the builders’ dumping site for materials but it’s a space that doesn’t seem to have been used for a while, so let’s have the upper promenade back.

    As for the new cycle lane, this is the backdoor con we’ve been expecting for some time. Far from being ‘temporary’ it’s always been on the council’s Green/Lab coalition agenda because of the nut jobs who are currently in charge. They put ideology ahead of common sense.

    Note too, they have just widened the pedestrian island at the bottom of west street, so the bit of road left for cars, lorries, taxis and buses will be down to single file in each direction. This is an obvious slap in the face for any commuters wishing to get across the city, and for any visitors arriving by car.

    It’s not clear either why the pedestrian underpass leading to the beach has not yet re-opened.
    It’s like the council want to put a deliberate road block in place, diving west from east.
    If there was other public transport available, or new park and ride schemes in place, then it might make sense.
    I suspect many cyclists will still ride on the promenade because most are in no hurry and they want to look at the sea.

    Reply
  2. James says:
    6 years ago

    Excellent. Putting locals first.

    Reply

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

This site uses Akismet to reduce spam. Learn how your comment data is processed.

Most read

Pavement gullies for electric cars to be trialled

Drowned women now identified, police believe

Former Brighton MP gives Burnham a boost

End to Shelter Hall roadworks finally in sight after four years

i360 UFO delusions lead to bus stop attacks

New Greggs update: A27 traffic chaos to end within 24 hours, says MP

Woman admits pulling fellow mum’s braids out and smashing glasses during school run attack

Three women recovered off Brighton beach not believed to have attended nightclub

Cyclist threatened to beat up bike shop staff over repair bill

Lewes brewery plans taproom and pizza restaurant next to Prince Albert

Newsletter

Arts and Culture

  • All
  • Music
  • Theatre
  • Food and Drink
credit - Claire Gaby

Tonight – Bert and Nasi

17 May 2026

MEAT – preview

17 May 2026
The Doris Show, Brighton Lantern Theatre, May 14-16th 2026

Doris Daydream Brings Nostalgia

17 May 2026

Norman’s Big Day Out

16 May 2026
Load More

Sport

  • All
  • Brighton and Hove Albion
  • Cricket
Bruce on the Boundary – Robinson ready to take the next step

Sussex hang on as Somerset match heads for a draw

by Richard Latham - ECB Reporters Network supported by Rothesay
17 May 2026
0

Somerset 526-8 dec (128.4 overs) Sussex 236-8 (69.1 overs) Sussex (1 point) trail Somerset (6 points) by 290 runs with...

Brighton and Hove Albion thwarted by last-gasp goal at Leeds

Brighton and Hove Albion thwarted by last-gasp goal at Leeds

by Mark Tiro
17 May 2026
0

Leeds United 1 Brighton and Hove Albion 0 Dominic Calvert-Lewin struck a stoppage-time winner as Leeds dealt Brighton’s hopes of...

One change as Brighton and Hove Albion face Leeds United

One change as Brighton and Hove Albion face Leeds United

by Frank le Duc
17 May 2026
0

As Brighton and Hove Albion face Leeds United, Seagulls head coach Fabian Hürzeler has made one change to the side...

Bruce on the Boundary – Robinson ready to take the next step

Sussex chase impressive first innings total at Somerset

by Richard Latham - ECB Reporters Network supported by Rothesay
16 May 2026
0

Somerset 526-8 dec (128.4 overs) Sussex 22-1 (5.1 overs) Sussex (1 point) trail Somerset (4 points) by 504 runs Centuries...

Load More
June 2020
M T W T F S S
1234567
891011121314
15161718192021
22232425262728
2930  
« May   Jul »

RSS From Sussex News

  • Man charged with murder 17 May 2026
  • Woman found dead and man held on suspicion of murder 15 May 2026
  • Smurf line drug dealer jailed 13 May 2026
  • Patti Smith: A legend returns to Brighton Dome 13 May 2026
  • Driver arrested after woman dies in crash today 12 May 2026
ADVERTISEMENT
  • About
  • Contact
  • Support
  • Newsletter
  • Privacy
  • Complaints
  • Ownership, funding and corrections
  • Ethics
  • T&C

© 2023 Brighton and Hove News

No Result
View All Result
  • News
    • Opinion
  • Arts and Culture
    • Music
    • Theatre
  • Sport
    • Cricket
  • Newsletter
  • Public notices
  • Advertise
  • About
  • Contact

© 2023 Brighton and Hove News