• About
    • Ethics policy
    • Privacy Policy
    • Ownership, funding and corrections
    • Complaints procedure
    • Terms & Conditions
  • Contact
  • Support
  • Newsletter
Brighton and Hove News
13 June, 2026
  • News
    • Politics
    • Business
    • Opinion
    • Community
  • Arts and Culture
    • Music
    • Theatre
    • Food and Drink
  • Sport
    • Brighton and Hove Albion
    • Cricket
  • Newsletter
  • Public notices
  • Advertise
No Result
View All Result
  • News
    • Politics
    • Business
    • Opinion
    • Community
  • Arts and Culture
    • Music
    • Theatre
    • Food and Drink
  • Sport
    • Brighton and Hove Albion
    • Cricket
  • Newsletter
  • Public notices
  • Advertise
No Result
View All Result
Brighton and Hove News
No Result
View All Result
Home Brighton

Half term engineering work could be postponed after timetable chaos

by Jo Wadsworth
Wednesday 4 Jul, 2018 at 11:18AM
A A
0
More reliable Brighton mainline promised after upgrade completed


Two half-term weeks of engineering works could be postponed by Network Rail following the shambolic introduction of new timetables on the Brighton mainline.

The works had been due to take place for nine days from Saturday, 20 October and nine days from Saturday, February 2019 – but Network Rail now says it wants to back these dates if possible following the “tough time” passengers have experienced since May’s timetable change.

The long closures between Three Bridges and both Brighton and Lewes are to give engineers the chance to repair tunnels and replace tracks, points and signals.

On Monday night, multiple signal failures on this stretch of track saw many commuters stuck on trains for up to three hours attempting to get home.

Meanwhile, this Sunday a day’s engineering work will close the line, with Victoria trains from Brighton diverted via Littlehampton, doubling the journey time.

Limited buses will be available, and passengers are advised to use alternative means of travel.

John Halsall, Network Rail route managing director, said: “I know many passengers have had a really tough time since the timetable change in May.

“That’s why I’ve asked for a review of all our planned maintenance and improvement work with GTR to see if there are any opportunities to postpone or re-plan engineering work to a later date. This includes the major improvement programme planned for this autumn on the Brighton Main Line.”

The work taking place on Sunday is an essential part of the £300m Government-funded programme to tackle delay hotspots and boost the reliability of the railway in the south east and lays the groundwork for a major programme of improvement work planned for the Brighton Main Line in autumn 2018 and early 2019.

Mr Halsall added: “The Brighton Main Line is one of the busiest and most congested routes in the country, but the simple truth is it’s nowhere near as reliable as passengers need and expect it to be.

“We know there’s never a good time to close the railway, but the work we’re carrying out this Sunday is a vital step towards a much-needed upgrade of the 1980s signalling system that will deliver a more reliable railway for passengers.”

Nick Brown, Chief Operating Officer for Govia Thameslink Railway, which runs Thameslink, Southern and Gatwick Express, said: “With fine weather forecast, we expect a lot of passengers will want to travel this Sunday but our message is seek alternative ways to get there if you can.

“We’re running as many trains and replacement buses as possible but they will be limited and we expect these to be very busy with queuing systems in place.

“If you’re heading to Brighton please use our diverted train services from London Victoria via Littlehampton but these will take considerably longer. Check National Rail Enquiries for revised times.”

Support quality, independent, local journalism that matters. Donate here.
ShareTweetShareSendSendShare

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

This site uses Akismet to reduce spam. Learn how your comment data is processed.

Most read

Council prepares to close Hove school site

Far right rally and counter protest planned in Brighton this weekend

Fights break out over parking spaces as new restrictions come under fire

Hove GP put kids at harm by prescribing hormones without proper assessment or monitoring, damning report finds

Staff at troubled property company reportedly quit

Scores of primary school children take part in exchange trip to Spain

Thugs punch railway worker unconscious at Brighton station

Half term engineering work could be postponed after timetable chaos

Police identify two suspects after rail worker punched unconscious

Rogue scaffolders left with £5k court bill

Newsletter

Arts and Culture

  • All
  • Music
  • Theatre
  • Food and Drink
Hyperreal announce ‘Midsummer’s Night Carnival Of Light’

Hyperreal announce ‘Midsummer’s Night Carnival Of Light’

11 June 2026
Vona Vella & chums are heading to Brighton

Vona Vella & chums are heading to Brighton

11 June 2026
The Beekeeper of Aleppo comes to Theatre Royal Brighton for final tour stop

Review: The Beekeeper of Aleppo, Theatre Royal Brighton

10 June 2026
‘Girls Night Out Fest’ celebrate women and non binary musicians

‘Girls Night Out Fest’ celebrate women and non binary musicians

9 June 2026
Load More

Sport

  • All
  • Brighton and Hove Albion
  • Cricket
Bruce on the Boundary – Robinson ready to take the next step

Sussex shine on day one against Glamorgan at Hove

by Bruce Talbot - ECB Reporters Network supported by Rothesay
12 June 2026
0

Sussex 136-2 (44 overs) Glamorgan 155 (51.2 overs) Sussex trail by 19 runs with eight first innings wickets remaining Indian...

Council submits plans for £65m new King Alfred Leisure Centre

Date set to decide £65m King Alfred plan

by Sarah Booker-Lewis - local democracy reporter
10 June 2026
32

A date has been set for the council’s Planning Committee to decide whether to approve plans for a new King...

Bruce on the Boundary – Robinson ready to take the next step

Sussex Sharks cruise to seven-wicket win over Kent in T20

by Paul Weaver - ECB Reporters Network supported by Rothesay
7 June 2026
0

Sussex Sharks 135-3 (17.2 overs) beat Kent Spitfires 133-8 (20 overs) by seven wickets Sean Hunt shone for the Sussex...

Brighton and Hove Albion agree to sign teen winger for £21m

Brighton and Hove Albion agree to sign teen winger for £21m

by Frank le Duc
7 June 2026
0

Brighton and Hove Albion have agreed to sign an 18-year-old winger for £21.5 million on a five-year deal. The club...

Load More
July 2018
M T W T F S S
 1
2345678
9101112131415
16171819202122
23242526272829
3031  
« Jun   Aug »

RSS From Sussex News

  • Commuting burglar caught red-handed 12 June 2026
  • Police identify two suspects after rail worker punched unconscious 11 June 2026
  • Sussex ranks among Britain’s catfishing hotspots as dating scams net £4m 11 June 2026
  • Thugs punch railway worker unconscious at station 11 June 2026
  • Gatwick names key partners for £1bn capital programme 10 June 2026
ADVERTISEMENT
  • About
  • Contact
  • Support
  • Newsletter
  • Privacy
  • Complaints
  • Ownership, funding and corrections
  • Ethics
  • T&C

© 2023 Brighton and Hove News

No Result
View All Result
  • News
    • Opinion
  • Arts and Culture
    • Music
    • Theatre
  • Sport
    • Cricket
  • Newsletter
  • Public notices
  • Advertise
  • About
  • Contact

© 2023 Brighton and Hove News