• About
    • Ethics policy
    • Privacy Policy
    • Ownership, funding and corrections
    • Complaints procedure
    • Terms & Conditions
  • Contact
  • Support
  • Newsletter
Brighton and Hove News
30 April, 2026
  • News
    • Politics
    • Business
    • Opinion
    • Community
  • Arts and Culture
    • Music
    • Theatre
    • Food and Drink
  • Sport
    • Brighton and Hove Albion
    • Cricket
  • Newsletter
  • Public notices
  • Advertise
No Result
View All Result
  • News
    • Politics
    • Business
    • Opinion
    • Community
  • Arts and Culture
    • Music
    • Theatre
    • Food and Drink
  • Sport
    • Brighton and Hove Albion
    • Cricket
  • Newsletter
  • Public notices
  • Advertise
No Result
View All Result
Brighton and Hove News
No Result
View All Result
Home Brighton

Buses to replace trains during £2.2m track and signal upgrade

by Frank le Duc
Wednesday 13 Mar, 2024 at 10:21AM
A A
2
Buses to replace trains during £2.2m track and signal upgrade

Rail bosses have warned passengers that buses are due to replace trains over the Easter weekend as work takes place as part of a £2.2 million upgrade of track and signalling equipment.

The east coastway line will be closed between Lewes and Pevensey and Westham while the work takes place.

The train operator Southern plans to lay on two buses an hour between Lewes and Eastbourne via Polegate.

There will also be two buses an hour between Lewes and Eastbourne via Polegate and Hampden Park although this service is not due to run on Easter Sunday.

One bus an hour is scheduled to run between Lewes and Eastbourne via Glynde, Berwick, Polegate and Hampden Park.

And two buses an hour should run between Eastbourne and Pevensey and Westham via Hampden Park and Polegate then direct to Bexhill.

Southern added: “A limited train service will operate from Pevensey and Westham, eastwards to Hastings/Ore with connections from there towards Ashford International.”

Network Rail said: “From Friday 29 March to Monday 1 April, customers are being urged to check before they travel as buses replace trains across parts of the railway in Kent, Sussex and South London.

“A number of planned upgrades will take place over the Easter weekend as part of a wider £89 million programme of investment across the country which will see improvements to track and signalling.

“At Willingdon Junction in Eastbourne, a £2.2 million investment in the infrastructure will improve reliability for passengers and has been designed to have a life expectancy of at least 50 years.

“This will include renewing the switches and crossings (the moveable sections of track that guide trains from one track to another and allow them to cross paths), installing new points (the equipment that allows trains to switch tracks) and heating equipment to support their continued reliable running during the cold winter months.

“Alongside this, 750 metres of third rail (the electrified 750-volt rail that powers trains) will be renewed and 2,300 tonnes of new ballast (the stones beneath the track that support the rails and sleepers) and 450 new concrete sleepers will be installed.”

Passengers are urged to check before they travel at www.nationalrail.co.uk or on the Southern website.

Network Rail’s Sussex route director Lucy McAuliffe said: “We’re grateful to our passengers for their patience while we carry out essential work over the Easter period.

“We carry out a large amount of our work during Easter as passenger numbers are lower, so we disrupt fewer journeys.

“The majority of our routes will be open as usual for people wanting to travel over the Easter bank holiday but some services will be affected so we’re asking passengers to plan ahead and check before they travel.”

GTR’s customer services director Jenny Saunders said: “We thank our customers for their understanding while Network Rail undertake these vital improvements.

“To help people travel over the Easter weekend, buses will replace trains on some routes so please allow extra time when planning your journey and double-check your route before setting off.”

Support quality, independent, local journalism that matters. Donate here.
ShareTweetShareSendSendShare

Comments 2

  1. Robert Marston says:
    2 years ago

    Why don’t you go digital with your signalling like the ecml which would give you more reliability

    Reply
  2. Steve Lockhart says:
    2 years ago

    It’s a joke what about people like me who have to work and start early.

    Reply

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

This site uses Akismet to reduce spam. Learn how your comment data is processed.

Most read

Building manager charged with £162k fraud

Pub applies for 2.30am closing time

Buses to replace trains during £2.2m track and signal upgrade

Coffee shop bids to keep back garden sauna

Fewer homeless people being moved from Brighton to Eastbourne

Man charged with Regency Square murder

Hove home owner seeks consent for shared house revamp

City centre pub set to get its garden back

McDonald’s could be off the menu in Hove

Teen who died in youth custody had heart condition, inquest hears

Newsletter

Arts and Culture

  • All
  • Music
  • Theatre
  • Food and Drink
The Doris Show, Brighton Lantern Theatre, May 14-16th 2026

Doris Day Tells Her Story

30 April 2026
Carlos Acosta’s Carmen ignites Theatre Royal Brighton

Carlos Acosta’s Carmen ignites Theatre Royal Brighton

29 April 2026
Jellyfish Theatre’s The Dragon Wagon is rolling into Brighton Fringe this May

Jellyfish Theatre’s The Dragon Wagon is rolling into Brighton Fringe this May

29 April 2026

Three Score Dance Previews Betwixt at Brighton Festival

29 April 2026
Load More

Sport

  • All
  • Brighton and Hove Albion
  • Cricket
Kickboxers face fight to extend opening hours

Kickboxers face fight to extend opening hours

by Sarah Booker-Lewis - local democracy reporter
30 April 2026
2

A martial arts school has applied to open from 7am, with some neighbours objecting and others offering support. Kickboxfit (KBF)...

Simpson steers Sussex into strong position on day two v Hampshire

Sussex draw with Yorkshire at Headingley

by Graham Hardcastle - ECB Reporters Network supported by Rothesay
27 April 2026
0

Yorkshire 511 (139.2 overs) Sussex 502 (131.4 overs) and 324-8 (86 overs) Match drawn Yorkshire 13 points, Sussex 13 points...

Simpson steers Sussex into strong position on day two v Hampshire

Runs galore but Sussex look set for draw with Yorkshire at Headingley

by Graham Hardcastle - ECB Reporters Network supported by Rothesay
26 April 2026
0

Yorkshire 511 (139.2 overs) Sussex 502 (131.4 overs) and 31-2 (14 overs) Sussex (5 points) lead Yorkshire (5 points) by...

Simpson steers Sussex into strong position on day two v Hampshire

Runs keep coming on day two as Yorkshire host Sussex

by Graham Hardcastle - ECB Reporters Network supported by Rothesay
25 April 2026
0

Yorkshire 192-1 (60 overs) Sussex 502 all out (131.4 overs) Yorkshire (2 points) trail Sussex (4 points) by 310 runs...

Load More
March 2024
M T W T F S S
 123
45678910
11121314151617
18192021222324
25262728293031
« Feb   Apr »

RSS From Sussex News

  • County historian to share tales of silly Sussex 20 April 2026
  • Two flee from flat as arsonist sets fire to barber shop below 18 April 2026
  • Four people convicted of plot to throw drugs and phones into prison 17 April 2026
  • July trial date set for boy, 16, charged with murdering teen 17 April 2026
  • Serious crash closes A23 just north of Brighton 17 April 2026
ADVERTISEMENT
  • About
  • Contact
  • Support
  • Newsletter
  • Privacy
  • Complaints
  • Ownership, funding and corrections
  • Ethics
  • T&C

© 2023 Brighton and Hove News

No Result
View All Result
  • News
    • Opinion
  • Arts and Culture
    • Music
    • Theatre
  • Sport
    • Cricket
  • Newsletter
  • Public notices
  • Advertise
  • About
  • Contact

© 2023 Brighton and Hove News