• About
    • Ethics policy
    • Privacy Policy
    • Ownership, funding and corrections
    • Complaints procedure
    • Terms & Conditions
  • Contact
  • Support
  • Newsletter
Brighton and Hove News
2 November, 2026
  • News
    • Politics
    • Business
    • Opinion
    • Community
  • Arts and Culture
    • Music
    • Theatre
    • Food and Drink
  • Sport
    • Brighton and Hove Albion
    • Cricket
  • Newsletter
  • Public notices
  • Advertise
No Result
View All Result
  • News
    • Politics
    • Business
    • Opinion
    • Community
  • Arts and Culture
    • Music
    • Theatre
    • Food and Drink
  • Sport
    • Brighton and Hove Albion
    • Cricket
  • Newsletter
  • Public notices
  • Advertise
No Result
View All Result
Brighton and Hove News
No Result
View All Result
Home Brighton

Rampion wind farm could double in size

by Frank le Duc
Thursday 14 Jan, 2021 at 5:03PM
A A
3
Last Rampion turbine switched on

People are being asked to share their views about plans to double the size of the Rampion offshore wind farm by the end of the decade.

Bosses are holding an initial four-week informal consultation about their plans to power more than a million homes with up to 116 new turbines, making 232 in total.

The consultation starts today (Thursday 14 January) before “a full and formal consultation” later this year.

The aim of the informal consultation is partly to raise awareness but also to seek feedback about the proposed extension which looks likely to be to the west.

The project team hopes to submit plans for “Rampion 2” to the government by the end of the year, with a view to starting construction in 2025-26 subject to consent.

Rampion 2 bosses said: “Depending on the final scheme, Rampion 2 could create clean renewable electricity to power over one million homes in the UK and reduce carbon emissions by around 1.8 million tonnes per year, in addition to Rampion’s existing generation.

“In autumn last year, it was announced that an offshore ‘area of search’ was being assessed for a maximum of up to 116 turbines, the same number as the existing Rampion Offshore Wind Farm.

“The results of technical and environmental surveys and stakeholder feedback will be used to identify the optimum site for the new wind farm, which will be located somewhere within this area.

“A subsea export cable is proposed to bring the power ashore under Climping beach, with an underground onshore cable route required to bring the power inland to connect to the national transmission grid at Bolney where three potential sites are being considered for a new substation.”

Rampion 2 development and stakeholder manager Chris Tomlinson said: “For the past 18 months, we have undertaken a series of desktop studies and site surveys to establish the physical lie of the land.

“We have also been talking with many local authorities, MPs, parish councils and experts on wildlife, environment, transport, geology, archaeology, business and fishing.

“We will use the results of our investigations and stakeholder engagement to identify the best possible sites for the onshore and offshore project elements while minimising disturbance to the local community and environment in delivering this vital green energy project.

“At this early stage, we would very much welcome feedback from the Sussex community so that we are aware of all local issues, concerns and constraints as we prepare more detailed proposals for a formal public consultation later this year.”

The project team plans to build on the expertise and learning from the original Rampion project to ensure best practice.

The team hopes to maximise the environmental and economic benefits while mitigating impacts on wildlife and the community and minimising inconvenience during construction.

Renewable energy business RWE is leading the Rampion 2 project on behalf of a group of a joint venture company.

The joint venture company includes a consortium led by the investment bank Macquarie, comprising Macquarie European Infrastructure Fund 5, the Green Investment Group and the Universities Superannuation Scheme.

It also includes North American energy infrastructure company Enbridge and the owners of the existing Rampion offshore wind farm.

Picture by Darren Cool www.dcoolimages.com

The joint venture secured an option to develop the site when it signed a lease agreement with the Crown Estate, which has responsibility for the seabed.

It said: “A ‘virtual village hall’ exhibition experience has gone live at www.rampion2.com for people to find out more and to share their views and any local information they think may be important for the project design.

“Online visitors can tour the exhibition to study maps and charts, watch a video flying over the onshore cable route options, find out how the operating Rampion wind farm was built or arrange a virtual meeting with members of the project team to ask more detailed questions.

“Rampion is the only wind farm off the south coast of England and this densely populated region is where much of the electricity demand is concentrated.

“The cost of offshore wind has halved in just two to three years and is now cheaper than nuclear and coal, while creating tens of thousands of jobs nationwide.

“The UK leads the world in offshore wind and the government is committed to quadrupling offshore wind capacity to 40 gigawatts (GW) by 2030.

“Rampion 2 can make a major contribution to this target.”

For more details about the original Rampion wind farm, visit www.rampionoffshore.com.

Support quality, independent, local journalism that matters. Donate here.
ShareTweetShareSendSendShare

Comments 3

  1. Rostrum says:
    6 years ago

    Even more of an eyesore…..

    Reply
  2. James says:
    6 years ago

    We need to triple the size.

    Reply
  3. Jason says:
    6 years ago

    Seems like a good idea at first glance, and as someone pointed out elsewhere, the area then becomes a “nature reserve”, protecting fish and other wildlife from trawling, but what happens medium to long term?

    I may be wrong, but my understanding is that these things have only a 20-year useful life and can’t easily be refurbished.

    20 years of free electricity (minus installation costs), then decaying foundations as a danger to shipping for centuries to come.

    Look what happened to the West pier if you don’t believe me. There’s no money in hazard removal, so they won’t bother.

    Reply

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

This site uses Akismet to reduce spam. Learn how your comment data is processed.

Most read

Former councillor praises caring A&E staff after hours in corridor

Complaint about former deputy mayor heard in secret

Rampion wind farm could double in size

Van Morrison simply can’t get enough of Brighton Dome

Transvision Vamp play their first Brighton gig since 1989

Driver arrested for attempted murder after two men hurt in hit and run

The Cure founder member Lol Tolhurst plays headline gig in Brighton

Seagulls remain grounded after beating the Sky Blues

Dealer stole electricity for attic cannabis farm, court hears

Burglar stole gold in targeted burglaries, police believe

Newsletter

Arts and Culture

  • All
  • Music
  • Theatre
  • Food and Drink
Cine-City The Film Factory, St. Ann's Wells Garden Cafe, 26th November 2026

Explore Brighton’s Film History

2 November 2026
Dexys Midnight Runners – Brighton Dome: The Same Old Fire Still Burns

Dexys Midnight Runners – Brighton Dome: The Same Old Fire Still Burns

2 November 2026
A Chance Encounter with Theatre Of Hate & Skids

A Chance Encounter with Theatre Of Hate & Skids

1 November 2026
Transvision Vamp play their first Brighton gig since 1989

Transvision Vamp play their first Brighton gig since 1989

1 November 2026
Load More

Sport

  • All
  • Brighton and Hove Albion
  • Cricket
Five-star show as Brighton and Hove Albion thrash Coventry City

Seagulls remain grounded after beating the Sky Blues

by PA sport staff
1 November 2026
0

Brighton and Hove Albion captain Lewis Dunk said that no one at the club was getting carried away by their...

Ayari bags only goal as Brighton and Hove Albion beat Manchester City

Ayari bags only goal as Brighton and Hove Albion beat Manchester City

by Andy Hampson - PA
31 October 2026
0

Manchester City 0 Brighton and Hove Albion Yasin Ayari made amends for failing to score from the spot in the...

Six changes as Brighton and Hove Albion take on Man City again

Six changes as Brighton and Hove Albion take on Man City again

by Frank le Duc
31 October 2026
0

Brighton and Hove Albion head coach Fabian Hürzeler has made six changes to the starting line up as the Seagulls...

Penalty heartache for Brighton and Hove Albion at Manchester City

Penalty heartache for Brighton and Hove Albion at Manchester City

by Andy Hampson - PA
28 October 2026
0

Manchester City 2 Brighton and Hove Albion 2 (Manchester City win 4-3 on penalties) Brighton and Hove Albion went ahead...

Load More
January 2021
M T W T F S S
 123
45678910
11121314151617
18192021222324
25262728293031
« Dec   Feb »

RSS feed: From Sussex News From Sussex News

  • One man dies and two in hospital after two-car crash 1 November 2026
  • Burglar stole gold in targeted burglaries, police believe 30 October 2026
  • Stay out of Lewes on Bonfire Night, urge 999 chiefs 29 October 2026
  • Bus driver recognised for saving former mayor’s life 28 October 2026
  • Man injured by rider on stolen motorbike 27 October 2026
ADVERTISEMENT
  • About
  • Contact
  • Support
  • Newsletter
  • Privacy
  • Complaints
  • Ownership, funding and corrections
  • Ethics
  • T&C

© 2023 Brighton and Hove News

No Result
View All Result
  • News
    • Opinion
  • Arts and Culture
    • Music
    • Theatre
  • Sport
    • Cricket
  • Newsletter
  • Public notices
  • Advertise
  • About
  • Contact

© 2023 Brighton and Hove News