• About
    • Ethics policy
    • Privacy Policy
    • Ownership, funding and corrections
    • Complaints procedure
    • Terms & Conditions
  • Contact
  • Support
  • Newsletter
Brighton and Hove News
17 May, 2026
  • News
    • Politics
    • Business
    • Opinion
    • Community
  • Arts and Culture
    • Music
    • Theatre
    • Food and Drink
  • Sport
    • Brighton and Hove Albion
    • Cricket
  • Newsletter
  • Public notices
  • Advertise
No Result
View All Result
  • News
    • Politics
    • Business
    • Opinion
    • Community
  • Arts and Culture
    • Music
    • Theatre
    • Food and Drink
  • Sport
    • Brighton and Hove Albion
    • Cricket
  • Newsletter
  • Public notices
  • Advertise
No Result
View All Result
Brighton and Hove News
No Result
View All Result
Home Hove

Hove beach extension work to begin in autumn

by Jo Wadsworth
Wednesday 30 Apr, 2025 at 2:55PM
A A
11
Hove beach set to grow with new groynes

Work to extend Hove beach out to sea is to begin in autumn.

Brighton and Hove City Council last week agreed to increase the budget for the latest phase of sea defences from £6.5 million to £11 million.

Work has already been done to build a protective layer of rock next to Basin Road South and a new sea wall near the Hove Deep Sea Anglers Club.

The next stage involves building new timber groynes, extending the beach between the King Alfred Leisure and Second Avenue and rebuilding sea defences on Southwick beach.

Councillor Trevor Muten, Cabinet member for Transport and Public Realm, said: “This scheme is vital for the city, to safeguard homes and businesses from coastal flooding and protect our local economy for decades to come.

“By taking action now, we will help make our city more climate resilient and able to adapt to increasing storms, extreme rainfall and rising sea levels.

“We are committed to value for money to deliver the best for our city. £4.5 million is a substantial sum, but our local visitor economy alone is worth £5 billion.

“This increase is due to inflationary costs affecting infrastructure projects nationwide, together with the need for additional shingle replenishment to stabilise the beach bays.

“We are a seafront destination, with important business hubs and transport links based around Shoreham Port and the A259 coast road.

“It is also densely populated, so this is an investment to protect our city, our residents and local businesses from flooding for the long term.”

The work is due to take place from late September 2025 to May 2026, timed to take place to avoid the summer season.

During the work, the council will enable seafront businesses to remain open.

The work is intended to create more space for people to enjoy, protect the city from sea level rise and storms and lead to fewer pebbles being thrown up onto the promenade during heavy storms.

At Southwick beach the work will start during 2026 with completion by April 2027.

Support quality, independent, local journalism that matters. Donate here.
ShareTweetShareSendSendShare

Comments 11

  1. MikeyMike says:
    1 year ago

    Who has requested this and where is the money coming from if the council is so short of money it is threatening to close our public libraries?
    Groynes are just as effective in stopping beach erosion and far cheaper so why extend the beach at a cost of £11m when the same anti-erosion measures could be achieved for £5k-£10k per groyne?
    Or is the aim to create more beach to privatise for second homes etc?

    Reply
    • Somebody says:
      1 year ago

      Have you tried reading the whole article? It summarises at the bottom the exact aim of the project

      Reply
    • ChrisC says:
      1 year ago

      Or you could take an actual interest and read the report that went to the last Cabinet meeting and the various previous reports over the years.

      All available on the councils website.

      Reply
  2. Sean Fowler says:
    1 year ago

    Unless you dam of!!the beaches nothing will stop the sea,I worked for the sea defence Brighton back in the sixties and the sea ripped out two ton plus coping stones along the under cliff walk and smashed the groins ,,no bother??? Boulders can disrupt waves but it will not stop them.I AM rather concerned at the council’s insistence of flooding,,,when did Brighton,,or hove or SOUTHWICK get flooded??? Never?? Is the answer so i dont agree with the council one bit,its another way of putting money in mates accounts it’s a fix and should be investigated

    Reply
    • ChrisC says:
      1 year ago

      Oh the old corruption allegation. Go to the police if you have any actual evidence otherwise layoff the unsubstantiated allegations.

      Reply
    • Somebody says:
      1 year ago

      Waiting to put flood defences in until after somewhere has been flooded is a very clever plan.

      Reply
    • Billy Short says:
      1 year ago

      Replying to Sean.
      The sea is indeed powerful, when it comes to storms and the generated big waves.
      But the plan here is to build new and longer groynes, which stop the longshore drift of shingle.
      That longshore drift is part of the daily tidal current cycle and is also caused by breaking waves.
      If you make the beaches wider – as here, with longer groynes – then that creates a more gently-shelving beach, which in turn allows the shorebreak waves to dissipate with less shingle movement.
      So that’s the plan, and let’s hope it works.
      The possible controversial bit, not mentioned here, is what the new groynes are made from.

      Reply
    • Gabe says:
      1 year ago

      Sean, just because a thing hasn’t happened yet doesn’t mean it won’t happen – a concept that you’re probably familiar with because you may have purchased house insurance.

      Reply
  3. Neil W says:
    1 year ago

    It’s a shame that we will lose the wonderful low tides ( as they are currently) , where the sand is exposed and families stroll along the edge of the sea.
    It is one of the most beautiful aspects of Hove Beach.

    Reply
  4. Ann E Nicky says:
    1 year ago

    King Canute is alive and kicking (and maybe working for the Council?) Wonder if these new groynes will trap all the sewerage that Southern Water pumps into the sea?

    Reply
  5. Rostrum says:
    1 year ago

    Terrible piece of photo-editing !

    Reply

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

This site uses Akismet to reduce spam. Learn how your comment data is processed.

Most read

Pavement gullies for electric cars to be trialled

Drowned women now identified, police believe

Former Brighton MP gives Burnham a boost

i360 UFO delusions lead to bus stop attacks

Hove beach extension work to begin in autumn

New Greggs update: A27 traffic chaos to end within 24 hours, says MP

Woman admits pulling fellow mum’s braids out and smashing glasses during school run attack

Three women recovered off Brighton beach not believed to have attended nightclub

Cyclist threatened to beat up bike shop staff over repair bill

Lewes brewery plans taproom and pizza restaurant next to Prince Albert

Newsletter

Arts and Culture

  • All
  • Music
  • Theatre
  • Food and Drink
The Doris Show, Brighton Lantern Theatre, May 14-16th 2026

Doris Daydream Brings Nostalgia

17 May 2026

Norman’s Big Day Out

16 May 2026

Betwixt – Three Score Dance – Review

16 May 2026
C'est Magnifique, Brighton i360, 14th May 2026

C’est Magnifique Take To The Skies

15 May 2026
Load More

Sport

  • All
  • Brighton and Hove Albion
  • Cricket
Bruce on the Boundary – Robinson ready to take the next step

Sussex chase impressive first innings total at Somerset

by Richard Latham - ECB Reporters Network supported by Rothesay
16 May 2026
0

Somerset 526-8 dec (128.4 overs) Sussex 22-1 (5.1 overs) Sussex (2 points) trail Somerset (4 points) by 504 runs Centuries...

Bruce on the Boundary – Robinson ready to take the next step

Sussex face confident Somerset batters on day one at Taunton

by Richard Latham - ECB Reporters Network supported by Rothesay
15 May 2026
0

Somerset 335-5 (96 overs) Sussex yet to bat Sussex (1 point) trail Somerset (2 points) by 335 runs Tom Abell...

Bruce on the Boundary – Robinson ready to take the next step

Sussex cruise to seven-wicket win over Leicestershire at Hove

by Bruce Talbot - ECB Reporters Network supported by Rothesay
11 May 2026
0

Sussex 430 (113.4 overs) and 131-3 (15.3 overs) Leicestershire 328 (88.4 overs) and 232 (80.5 overs) Sussex (23 points) beat...

Bruce on the Boundary – Robinson ready to take the next step

Sussex kept at bay as Leicestershire fight back on day three at Hove

by Paul Weaver - ECB Reporters Network supported by Rothesay
10 May 2026
0

Sussex 430 all out (113.4 overs) Leicestershire 328 all out (88.4 overs) and 154-4 (56 overs) Leicestershire (5 points) lead...

Load More
April 2025
M T W T F S S
 123456
78910111213
14151617181920
21222324252627
282930  
« Mar   May »

RSS From Sussex News

  • Woman found dead and man held on suspicion of murder 15 May 2026
  • Smurf line drug dealer jailed 13 May 2026
  • Patti Smith: A legend returns to Brighton Dome 13 May 2026
  • Driver arrested after woman dies in crash today 12 May 2026
  • Ministers consult on latest plan for shake up of Sussex councils 12 May 2026
ADVERTISEMENT
  • About
  • Contact
  • Support
  • Newsletter
  • Privacy
  • Complaints
  • Ownership, funding and corrections
  • Ethics
  • T&C

© 2023 Brighton and Hove News

No Result
View All Result
  • News
    • Opinion
  • Arts and Culture
    • Music
    • Theatre
  • Sport
    • Cricket
  • Newsletter
  • Public notices
  • Advertise
  • About
  • Contact

© 2023 Brighton and Hove News