• About
    • Ethics policy
    • Privacy Policy
    • Ownership, funding and corrections
    • Complaints procedure
    • Terms & Conditions
  • Contact
  • Support
  • Newsletter
Brighton and Hove News
3 September, 2026
  • News
    • Politics
    • Business
    • Opinion
    • Community
  • Arts and Culture
    • Music
    • Theatre
    • Food and Drink
  • Sport
    • Brighton and Hove Albion
    • Cricket
  • Newsletter
  • Public notices
  • Advertise
No Result
View All Result
  • News
    • Politics
    • Business
    • Opinion
    • Community
  • Arts and Culture
    • Music
    • Theatre
    • Food and Drink
  • Sport
    • Brighton and Hove Albion
    • Cricket
  • Newsletter
  • Public notices
  • Advertise
No Result
View All Result
Brighton and Hove News
No Result
View All Result
Home Brighton

New Greggs update: A27 traffic chaos to end within 24 hours, says MP

by Frank le Duc
Friday 15 May, 2026 at 6:01AM
A A
14
New Greggs update: A27 traffic chaos to end within 24 hours, says MP

James MacCleary

The traffic chaos on the A27, next to the site of a new Greggs, should end within 24 hours – weather permitting – according to an MP.

James MacCleary, the Liberal Democrat MP for Lewes, posted an update on social media about the disruptive roadworks between Falmer and Lewes.

Mr MacCleary said: “I have heard from huge numbers of residents about the impact this has had – from people stuck in traffic for hours to pupils nearly missing exams and local sports teams having to cancel fixtures.

“While safety must always come first, lessons clearly need to be learnt from how these works were planned and managed.

“The scale of disruption on one of the area’s busiest roads has been completely disproportionate.

“Roadworks of this scale might be unavoidable for major infrastructure upgrades but many residents will rightly question whether this level of disruption was justified for a new drive-through bakery.

“Following concerns raised with me, I contacted National Highways directly.

“They confirmed the original proposal would have seen daytime works continue for around nine weeks but that this was reduced following discussions with contractors.

“The current traffic management is expected to be removed following overnight works concluding on Friday 15 May (morning of Saturday 16 May), weather permitting.

“I know how frustrating this situation has been and I will continue pressing for a review into how works like this are handled in future so residents are not subjected to this level of disruption again.”

The work affecting the A27 itself is the construction of a new slip road for the Greggs that is being built next to the Esso petrol station on the eastbound side of the A27.

The BBC quoted the contractor Landbuild apologising for the disruption and saying that it was not directly involved with the new Greggs project.

The company said that it had been “lengthening slip roads to the service station and improving the combined pedestrian and cycle lane”.

As a result, Landbuild told the BBC: “Lane closures were needed to ensure safety of the workforce and a 50mph speed reduction was required to ensure the temporary barrier system performed correctly in the event of an accident.”

The company told the broadcaster that the work was “being carried out seven days a week and overnight” and was expected to end today Friday 15 May.

Support quality, independent, local journalism that matters. Donate here.
ShareTweetShareSendSendShare

Comments 14

  1. Jon says:
    4 months ago

    Having cars pull in and exit from the fast moving A 27, crossing the 2-way bike and pedestrian path to get sausage rolls is dumb & dangerous

    Reply
    • Bob Johnson says:
      4 months ago

      It’s a petrol station. People have been doing that manoeuvre on this long straight bit of road for decades. A Greggs will make no difference to that.

      Reply
  2. Gen Xer says:
    4 months ago

    Landbuild have been involved in other notoriously slow to complete roadworks projects in West Sussex such as unwanted cycle paths and the addition of pedestrian/cycle islands at roundabouts. Maybe be paid by the hour.

    Reply
  3. Benj says:
    4 months ago

    I love doughnuts

    Reply
  4. Debra Corthorn says:
    4 months ago

    Ive decided not to use this petrol station ever again. These roadworks have been a nightmare. As for Greggs, certainly wont be using them either.

    Reply
  5. DC says:
    4 months ago

    I wont be using this petrol station ever again and certainly not the Greggs. Its been an absolute nightmare.

    Reply
  6. Zeon says:
    4 months ago

    Why are people acting like this is something new? There are far worse issues on our roads than a drive thru. Shut up, put up and be patient.. Safety is paramount.

    Reply
    • Greg framce says:
      4 months ago

      I’m pretty sure no one is saying this is a new thing never heard of before , what they are saying is that it’s stupid and has caused chaos and was utterly unnecessary ( and before you get all excited I don’t mean the safety I mean the whole project)

      Reply
  7. Quebec Tango says:
    4 months ago

    The congestion has been awful particularly at busy time and in my opinion, in the aid of a Greggs drive through, not warranted. However, the tail backs could be reduced by closing the slip road from Falmer heading east on to the A27. This would stop essentially three lanes going into one. Agreed it would inconvenience traffic wanting to join there but they are in a minority compared to through traffic, they would have to detour and join further back. It would. Many drivers are dashing up the slip road and back onto the A27 in a Quest to save a few car lengths adding to the congestion.
    The whole event is poorly organised and frankly unnecessary.

    Reply
  8. Andrew Williams says:
    4 months ago

    Madness now you know its crazy too

    Reply
  9. Andrew Williams says:
    4 months ago

    Its madness and very dangerous too were did the planning permission come form then to buit Greg’s then did people have there say then

    Reply
  10. Andrew Williams says:
    4 months ago

    Were people now invoice then why build here when people can order online on the app

    Reply
  11. Athena says:
    4 months ago

    Who approved the plan? Same people who won’t let anyone improve their homes?

    Reply
    • Graham Kensett says:
      4 months ago

      Why is the west bound slip road at Falmer closing for 8 weeks . Starting the 15th of june

      Reply

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

This site uses Akismet to reduce spam. Learn how your comment data is processed.

Most read

Another primary school cuts its intake

Bus crashes into parked cars at Portslade Station

Royal Pavilion and Brighton Museum boss to leave

New homes on tap at derelict pub

New Greggs update: A27 traffic chaos to end within 24 hours, says MP

Drill battery sparks city centre fire

Good grief – council to allow two more weeks for roadside shrines to crash victims

Milkshake fraudster back behind bars for more compo cons

NHS bosses extend Brighton doctors’ surgery contract from today

Last paddle steamer to sail from Newhaven

Newsletter

Arts and Culture

  • All
  • Music
  • Theatre
  • Food and Drink
Simple Minds announce new album and tour

Simple Minds announce new album and tour

3 September 2026
Hundreds object to plan for sports pitch close to open-air theatre

BHASVIC pledges to work with theatre as sports pitch wins approval

2 September 2026
‘Victorious Festival’ – Day One Report

‘Victorious Festival’ – Day One Report

2 September 2026
Royal Pavilion and Brighton Museum boss to leave

Royal Pavilion and Brighton Museum boss to leave

2 September 2026
Load More

Sport

  • All
  • Brighton and Hove Albion
  • Cricket
Hundreds object to plan for sports pitch close to open-air theatre

BHASVIC pledges to work with theatre as sports pitch wins approval

by Sarah Booker-Lewis - local democracy reporter
2 September 2026
0

Councillors granted planning permission for an artificial grass pitch and multi-use games area this afternoon (Wednesday 2 September) despite more...

Bruce on the Boundary – Robinson ready to take the next step

Porter helps Essex to contain Sussex on day one at Chelmsford

by Martin Smith - ECB Reporters Network supported by Rothesay
2 September 2026
0

Sussex 213-7 (86 overs) Essex (2 points), Sussex (0 points) Jamie Porter adopted the mantle of supersub when he came...

Brighton and Hove Albion sign Colombian teenager

Brighton and Hove Albion sign Colombian teenager

by Frank le Duc
30 August 2026
0

Brighton and Hove Albion have signed midfielder Matias Orozco, the 18-year-old captain of Colombia’s Under-20 national side. Orozco has joined...

Bruce on the Boundary – Robinson ready to take the next step

Sussex draw with Somerset at Hove as rain curtails play

by Paul Weaver - ECB Reporters Network supported by Rothesay
30 August 2026
0

Somerset 202 (58 overs) and 350-9 declared (97.2 overs) Sussex 250 (69.4 overs) and 62-1 (14 overs) Sussex (12 points)...

Load More
May 2026
M T W T F S S
 123
45678910
11121314151617
18192021222324
25262728293031
« Apr   Jun »

RSS From Sussex News

  • Man faces court charged with attacks on women 1 September 2026
  • Inquest due to open into Shoreham deaths tomorrow 1 September 2026
  • Drug dealer jailed for running cocaine and heroin supply line 31 August 2026
  • Woman’s body recovered from the sea 30 August 2026
  • Pier evacuated as fire breaks out 30 August 2026
ADVERTISEMENT
  • About
  • Contact
  • Support
  • Newsletter
  • Privacy
  • Complaints
  • Ownership, funding and corrections
  • Ethics
  • T&C

© 2023 Brighton and Hove News

No Result
View All Result
  • News
    • Opinion
  • Arts and Culture
    • Music
    • Theatre
  • Sport
    • Cricket
  • Newsletter
  • Public notices
  • Advertise
  • About
  • Contact

© 2023 Brighton and Hove News