• About
    • Ethics policy
    • Privacy Policy
    • Ownership, funding and corrections
    • Complaints procedure
    • Terms & Conditions
  • Contact
  • Support
  • Newsletter
Brighton and Hove News
7 August, 2026
  • News
    • Politics
    • Business
    • Opinion
    • Community
  • Arts and Culture
    • Music
    • Theatre
    • Food and Drink
  • Sport
    • Brighton and Hove Albion
    • Cricket
  • Newsletter
  • Public notices
  • Advertise
No Result
View All Result
  • News
    • Politics
    • Business
    • Opinion
    • Community
  • Arts and Culture
    • Music
    • Theatre
    • Food and Drink
  • Sport
    • Brighton and Hove Albion
    • Cricket
  • Newsletter
  • Public notices
  • Advertise
No Result
View All Result
Brighton and Hove News
No Result
View All Result
Home Brighton

University can replace crumbling concrete in listed building

by Sarah Booker-Lewis - local democracy reporter
Tuesday 8 Apr, 2025 at 9:33AM
A A
3
University can replace crumbling concrete in listed building

Arts A at Sussex University in Falmer - Picture by Paul Gillett / geograph.org.uk

Sussex University has been given permission to replace crumbling concrete in a one of the eight original buildings on it Falmer campus.

Brighton and Hove City Council has granted listed building consent to replace the crumbling RAAC (reinforced autoclaved aerated concrete) in Arts Building A.

The university commissioned a survey of 27 buildings three years ago and found RAAC in seven of them.

The council gave permission for RAAC panels to be replaced in the grade II* listed Arts Building A which went up in the 1960s and where the problems have also included leaks.

The concrete panels will be removed from the first-floor office, corridors and balcony and replaced with a new timber floor, glazed panel and zinc roof to the balcony.

The Falmer campus includes several brutalist concrete buildings designed by the architect Sir Basil Spence and constructed in the 1960s and 70s.

The use of RAAC was widespread at the time because it made concrete panels lighter but it has a 30-year lifespan.

This has left seven Sussex University buildings at risk – Arts A, Arundel, Bramber, Chichester I, Chichester II, Falmer House and the John Maynard Smith building.

The university submitted a report to the council, prepared by planning consultants Parker Dann.

It said: “The RAAC panels found within the office (room A172) and the adjacent corridor were identified as ‘critical risk’ and ‘high risk’ respectively with the panels found to have water staining, along with indications of potential fungal growth and to be in poor condition which raises concern regarding the structural integrity of the RAAC panels.

“The further survey in April 2024 identified water ingress and evidence of multiple localised failings of the RAAC panels.

“On the recommendations of the report, office A172 has been taken out of use.

“The report notes that due to the nature of the aerated concrete, the concrete itself deteriorates due to continuous exposure to moisture.

“This results in leaching of its structure, cracking and loss of structural integrity.

“It concludes that the RAAC planks are past the end of their viable life and pose a risk of brittle failure when traversed.

“It recommends the introduction of a supporting structural frame, replacing the RAAC panels within the floor construction entirely and identification of the source of moisture and taking appropriate action accordingly, prior to irreversible damage.”

Sussex University is replacing RAAC across the campus, with the first phase starting in April last year at Bramber House.

RAAC roof panels were removed from the multi-purpose student hub and replaced with timber and ply insulated roofing.

Support quality, independent, local journalism that matters. Donate here.
ShareTweetShareSendSendShare

Comments 3

  1. Dave says:
    1 year ago

    How is this grade 2 listed? Looks like any number of 60s school buildings. Knock it down if it’s cheaper and build it properly next time.

    Reply
    • ChrisC says:
      1 year ago

      The reasons for its listing are given in the register which is publically available.

      Reply
  2. Stan Reid says:
    1 year ago

    Its so called “listing” should be scrapped, that type of concrete was never inteded for more than 50 years lifetime, same as the crumbling housing towers around the country, same problem in many countries and many demolish them, no point in repairing what was never intended to last. Hitlers Bunkers in the North Sea, that is a concrete recipe for a few lifetimes, but no, in England we can do it cheaper.

    Reply

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

This site uses Akismet to reduce spam. Learn how your comment data is processed.

Most read

School can fence off playing fields from public

Car-free flats become slightly less car-free

University can replace crumbling concrete in listed building

Council leader accuses departing colleague of “breaching promise” to Labour party

Thousands of tonnes of shingle pumped onto Hove beach

Labour councillor quits, saying council is failing kids on trans issues

Planners aprove tennis courts floodlights yards from neighbours’ windows

Plans for ’80s shopping centre’ home in exclusive street slammed

Man attacked by stranger he bumped into

Tenant of mouldy flat ‘must hand over key’

Newsletter

Arts and Culture

  • All
  • Music
  • Theatre
  • Food and Drink
Jamaican reggae fusion band Third World announce Brighton gig

Kids comedy club comes to the Komedia

6 August 2026
Wot Italian? Komedia Brighton, 10th October 2026

Wot Italian?

6 August 2026
Queer Bloomsbury, Charleston Farmhouse, 15th August 2026

Queer Bloomsbury Celebrates Mid-Summer

6 August 2026
End of the Pier Show, August 2026, Horatio's Bar, Brighton Pier

Head To The End Of The Pier For Summertime Fun!

6 August 2026
Load More

Sport

  • All
  • Brighton and Hove Albion
  • Cricket
Planners turn umpire over tennis club floodlights

Planners aprove tennis courts floodlights yards from neighbours’ windows

by Sarah Booker-Lewis - local democracy reporter
6 August 2026
0

A tennis club has been granted planning permission to put up floodlights at its courts in St Ann’s Well Gardens....

Planners turn umpire over tennis club floodlights

Planners turn umpire over tennis club floodlights

by Sarah Booker-Lewis - local democracy reporter
3 August 2026
0

Plans to put up floodlights at a tennis court in Hove have divided a community. St Ann’s Tennis applied to...

Manager of Brighton and Hove Albion’s women team dismissed after allegations

Brighton and Hove Albion face trip to Transylvania or Arctic for first European tie

by Frank le Duc
3 August 2026
0

Brighton and Hove Albion are due to travel either to Transylvania or to the Arctic for their first Europa Conference...

Former Brighton and Hove Albion midfielder joins Chelsea

Former Brighton and Hove Albion midfielder joins Chelsea

by PA sport staff
2 August 2026
0

Chelsea have signed former Brighton and Hove Albion midfielder and Argentina international Valentin Barco from Strasbourg on a seven-year deal....

Load More
April 2025
M T W T F S S
 123456
78910111213
14151617181920
21222324252627
282930  
« Mar   May »

RSS From Sussex News

  • Driver dies 11 days after crash 6 August 2026
  • Two drug dealers join vape shop boss in jail 6 August 2026
  • Boy, 16, found guilty of murder 5 August 2026
  • Brighton’s ‘Mutations Festival’ announces the first 71 acts to join headliners Fat Dog and Mike D 5D (Beastie Boys) 5 August 2026
  • Man dies in crash 4 August 2026
ADVERTISEMENT
  • About
  • Contact
  • Support
  • Newsletter
  • Privacy
  • Complaints
  • Ownership, funding and corrections
  • Ethics
  • T&C

© 2023 Brighton and Hove News

No Result
View All Result
  • News
    • Opinion
  • Arts and Culture
    • Music
    • Theatre
  • Sport
    • Cricket
  • Newsletter
  • Public notices
  • Advertise
  • About
  • Contact

© 2023 Brighton and Hove News